Installation of air-conditioning air vent intake:  External glass removed, a hole cut in the precast concrete panel by drilling holes through panel and linking them up with a demo saw cut from both sides. Knocked block out and linked air conditioning air duct to new exterior vent.  Cut toughened glass, reinstalled reduced piece and Sealed

Image Gallery

  • Click to enlarge image IMG_3520 westpac.JPG
  •